Skip to content

    Glossary

    Third-party monitoring, in plain words

    Definitions of the terms used across monitoring contracts, field operations and reporting, and in TPMready itself.

    A

    Audit trail
    A searchable log of who changed what, and when: records created, updated or deleted, with old and new values side by side.
    Platform

    B

    Beneficiary interview
    An interview with a person who receives a programme's goods or services, used to record their experience of delivery.

    C

    Completeness score
    A percentage showing how complete an implementing partner's plan and its follow-up are, with a breakdown of what is missing.

    D

    Data check
    The quality review of collected data for completeness and consistency, carried out before a report can be approved.
    Checklist
    Data collection
    The visit status in which a field team is on site, or the visit is in progress, and tracking is being updated.

    E

    Enumerator
    A field data collector who conducts interviews and observations during site visits.
    Escalation
    Alerting the responsible people about stalled work so that it gets unblocked.

    F

    Facility
    The physical place that is visited, such as a clinic, school or distribution point. Facilities are stored once and reused across visits.
    Field team
    The group assigned to a visit: a team leader, enumerators, logistics staff and drivers.
    Fourth-party monitoring4PM
    Assessment of the systems an implementing partner, or its contracted monitors, uses to produce monitoring data. Often described as verifying the verifiers.
    Explainer

    G

    Geotagged evidence
    Photos and notes that carry the location and time at which they were captured, so that a visit can be verified.
    Guest access
    Read-only access for clients or donors to selected boards, dashboards and maps.

    I

    Implementing partnerIP
    The organisation that delivers the programme on the ground, such as a local NGO. Third-party monitoring checks its work.
    IP plan
    The monitoring plan for one implementing partner: what will be monitored, where and in which period. IP plans feed the list of site visits.

    K

    Kanban
    A board view in which cards sit in columns by status and move between them as work progresses.
    Key informant interviewKII
    An interview with someone who has particular knowledge of a programme or site, such as a facility manager or community leader.

    M

    Monitoring round
    One cycle of monitoring visits within a project, for example “Round 1 – Spring”.
    How-to

    N

    Nudge
    A reminder sent to the person responsible for incomplete information.

    O

    Observation checklist
    A structured list of things a field team checks by direct observation at a site, such as stock levels or the condition of facilities.

    P

    Pattern
    A group of similar red flags in the same area, or for the same partner, within a short time window.
    Post-visit card
    A follow-up card created after a visit to track actions, recommendations or findings until they are closed.

    R

    Red flag
    A serious issue found during monitoring, such as a stock-out or a safeguarding concern, that needs follow-up.
    How-to
    Remote monitoring
    Data collection carried out without a team on site, for example by phone, used when access is limited.

    S

    Sample size
    The number of sites, interviews or data points planned for a tool or a round.
    Site visit
    One planned trip by a field team to one location to collect data. In TPMready, each visit is a card that moves through Planning, Implementation, Reporting and Completed.
    Situation reportSitRep
    A short summary of the current state of a programme or round, prepared for managers or donors.
    Stalled
    A visit or task that has not progressed within the allowed number of days.

    T

    Third-party monitoringTPM
    Independent checking of a programme's delivery by an outside team that is neither the funder nor the implementer.
    Guide
    Triangulation
    Comparing findings across several sources, sites, partners or rounds to confirm whether an issue is real and how widespread it is.

    See TPMready with your own monitoring plan

    We will walk through a round from planning to approved report, using the structure of your contract: your partners, sites, tools and reporting lines.